Visual Circuits ReelTime 4 Manuel de service Page 50

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 111
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 49
4: Periodic Maintenance
CHRISTIE INC. - 35/70 Service/PM Manual
July, 1997
CHRISTIECHRISTIE 35/70 Projector
Annual Preventive Maintenance Log Sheet
Year: _____________
Action Required Date Performed
Check coupling between tacho roller and tacho generator
Check power supply voltages
Check reeling motor brakes
Visual inspection (loose bolts, screws, damaged cables, etc.)
Replace Particle Transfer Rollers
Clean back of projector with vacuum
Table 4.6: Annual Preventive Maintenance Checklist/Log Sheet
CHRISTIECHRISTIE 35/70 Projector
Lamphouse Preventive Maintenance Log Sheet
(Perform Every Time Lamphouse Bulb is Replaced)
Date: ______/______/______ Lamphouse Hour Meter Reading: ____________
Action Required Date Performed
Clean lamphouse mirror
Vacuum lamphouse assembly
Check lamp connectors
Check douser assembly
Check cooling blowers
Table 4.7: Lamphouse Preventive Maintenance Checklist/Log Sheet
Vue de la page 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 110 111

Commentaires sur ces manuels

Pas de commentaire