Visual Circuits ReelTime 4 Manuel de service Page 82

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 111
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 81
6: Mechanical and Electronic Adjustments
CHRISTIECHRISTIE 35/70 Service/PM Manual
March, 1997
Line Voltage Selection
To locate jumpers and terminals, refer to the 35/70 Power Supply component layout in Section 8.4.
240-VAC Operation
To configure the 35/70 projector for 240-VAC operation:
1. Remove the jumper from terminals 1&3 and 2&4 on T1 and the jumper T1 terminals 2&3.
120-VAC Operation
To configure the 35/70 projector for 120-VAC operation:
1. Remove the jumper from terminals 2&3 on T1 and jumper terminals 1&3 and 2&4 on T1.
Vue de la page 81
1 2 ... 77 78 79 80 81 82 83 84 85 86 87 ... 110 111

Commentaires sur ces manuels

Pas de commentaire